CLIENT
St Andrews Primary
SECTOR
Education
TECHNOLOGY
SOLAR PV
SYSTEM SIZE
12.3 kWp
Year 1 Generation
10.160 kWh
YEAR 1 SAVINGS
£1,100
PAYBACK
7 Years
LOCATION
Boothsown




The Background
St Andrews Primary School is based in Boothstown, Manchester. They began making a difference in their energy savings when we installed state-of-the-art LED Lighting. St Andrews wanted to continue improving their green credentials by installing a Solar PV System.
The Solution
Perfect Sense Energy designed a 12.3kW system onto St. Andrew’s roof. The system is set to generate 10.160kWh of free electricity per annum with a combined overall first year income and savings of over £1,100. The system is expected to save 53 tonnes of Co2 over a 25 year period and has a potential overall net income/savings of over £58,000.

The Results & Feedback
This 201kWp system is estimated to generate over 152,000 kWh with a 78% Own Power Consumption. This equates to a total year 1 savings of over £18,500 and equates a total project payback period of just 5 years. This system will save 36 tonnes of CO2 every year, greatly demonstrating Searchlight’s carbon reduction. The power generated can be used for free in the unit and reduces reliance on grid power and rising energy costs.

Request Your Personalised
Solar Savings Report
Unlock Your Solar Savings Potential: Secure your personalised Solar Saving Report today and discover the financial and environmental returns awaiting your business.
How much could your business benefit?
More Case Studies…
-

Ellard
Read Case StudyEllard saved £32,000 from year one. Discover how we reduced their energy costs and carbon footprint by installing a 136 kWp solar PV system.
: Ellard
-

AK Sheet Metal Fabrications
Read Case StudyA large-scale solar panels system was installed onto AK Sheet Metal Fabrications manufacturing roof in Hessle.
: AK Sheet Metal Fabrications