Client
Comfy Group
Sector
MANUFACTURING
Technology
Solar PV
SYSTEM SIZE
917.99 kW
Year 1 Generation
191,000 kWh
Year 1 Savings
£160,000
Payback
3-4 YEARS
Locations
MANCHESTER



The Background
The Comfy Group, a proud family-run business with roots dating back to 1973, has grown from modest beginnings into one of Europe’s leading manufacturers of duvets and pillows. Based in Manchester, their factory produces products that bring comfort to million. With a strong commitment to sustainability and innovation, they partnered with us to install a solar energy solution that supports their operations while reducing their environmental footprint. Here’s how we helped power their mission to deliver comfort, sustainably.
The Solution
To meet The Comfy Group’s sustainability goals and support their high-energy manufacturing operations, we designed and installed a bespoke Solar PV system across their site. This included a first install of 711.35 kW, capable of generating approximately 680,000 kWh per year, and a secondary system of 206.64 kW, capable of generating 199,500 kWh per year. These systems were carefully integrated with their existing infrastructure to maximize efficiency and reduce reliance on grid-supplied electricity.
The Results & Feedback
The installation now generates a total of nearly 880,000 kWh annually, significantly offsetting the site’s energy usage and contributing to substantial cost savings. This sustainable energy source not only reduces their carbon footprint by over 200 tonnes of CO₂ per year but also strengthens their commitment to environmentally responsible manufacturing. The solar solution supports The Comfy Group’s long-term vision of greener operations without compromising their ability to deliver quality products at scale

Request Your Personalised
Solar Savings Report
Unlock Your Solar Savings Potential: Secure your personalised Solar Saving Report today and discover the financial and environmental returns awaiting your business.
How much could your business benefit?
More Case Studies…
-

Ellard
Read Case StudyEllard saved £32,000 from year one. Discover how we reduced their energy costs and carbon footprint by installing a 136 kWp solar PV system.
: Ellard
-

AK Sheet Metal Fabrications
Read Case StudyA large-scale solar panels system was installed onto AK Sheet Metal Fabrications manufacturing roof in Hessle.
: AK Sheet Metal Fabrications


